A couple of weeks ago my construction rep, Marat (blue coveralls), taught me the following Russian poem:
Mojet da, mojet nyet / Mojet dojd, mojet snet.
Translation: Maybe yes, maybe no / Maybe rain, maybe snow. Alexander Sergeyovich Pushkin
I think it captures my experience in Tengiz. Sometimes things work and sometimes they don't. Either way there is way too much water here. Perhaps this wasn't what Pushkin had originally intended.
It's been a pretty ridiculous hitch so far. We lost a few engineers for various reasons. Projects got reassigned and now I have a lot more on my plate. The new projects are pretty interesting. The first involves installing a new flare and half a dozen hot taps into an existing flare line so that we can inspect our flare knockout drum. The second involves taking off-spec water from various places around the plant and pumping it to the White Elephant (not sure why it is called this, but it's our waste-water disposal well). The last one involves installing a new water metering station in Kulsary (the closest town - located about 1.5 hours away). It's going to be interesting trying to do any work there as we will either need to get a camp on site or drive back and forth every day.
My original project is moving along slowly as we have run out of disposal areas for the low pH water.
Here are some pictures from Tengiz.
The picture on the left is a prime example of why designers need to go to site. The design team thought we could bring a 75' flare through this gate. It's barely big enough to get a pick-up through.
Our civil engineer described the soil quality as "kind of like porridge". If you look closely you can see the horse tracks through the white.
These pictures were taken on the way back from the office one night. On the left is a toad. On the right is a mammal (hedgehog?). Other animal encounters I have experienced include black beetles falling from the light fixture above my desk (at least one per day), hundreds of mosquitoes and a scorpion stinging my materials coordinator. 8 months ago I could have sworn this place could not support life. Now I'm wondering if I was better off when it couldn't.
Despite the long hours, insects and heat this hitch has been good. I feel like I've fallen more in the groove of things and I learned some new ways of maneuvering through the system. The work has been challenging and I feel like I'm making some (albeit small) headway on the projects.